Cold store erection requires specialized thermal craftsmanship: continuous vapor-sealed joints, thermal-break corner cuts, and laser-leveled door tracks.

+15°C → -40°C Chiller, Freezer & Blast Regimes
60 – 200 mm 40–42 kg/m³ PUR & PIR Core
EN 10346 & HACCP 9-Layer Hygienic Steel & Profiles
81 İl & 32+ Ülke Direct Dispatch from Gebze Hub
Certified Site Installation, Erection & Commissioning — SerPan Cold
SITE ERECTION & COMMISSIONING: Certified Site Installation, Erection & Commissioning

Ficha Técnica Resumida

SITE ERECTION & COMMISSIONING
Panel Montaj Standardı
Lazer Terazi & PU Köşe Enjeksiyonu Köşe Birleşimlerinde İç Sac Kesimi (Thermal-Break) ve Tam Dolgu
Tavan & Hijyen
Alüminyum T-Askı & HACCP Süpürgelik Sarkmasız Tavan Kurulumu ve Antibakteriyel Mastik/Profil Dönüşü
Kapı Ayar & Test
Conta Baskı & Rezistans Kontrolü Yükselen Menteşe/Ray Ayarı, Ohm Testi ve Anti-Panik Kol Testi
Devreye Alma
Vakumlama, Gaz Şarjı & Pull-Down Oda Hedef Sıcaklığa İndirilerek Tutanakla Teslim Edilir

Integrated Cold Chain Building, Panel & Door Systems

42 kg/m³ PUR / B-s1,d0 PIR sandwich panels, heavy-duty industrial cold storage doors, and central refrigeration packages manufactured at our Gebze plant.

BASE DE CONOCIMIENTO TÉCNICO (EK C)

Preguntas Frecuentes de Ingeniería y Suministro

Preguntas técnicas frecuentes sobre puertas frigoríficas, selección de espesor de panel, sellado térmico y proyectos llave en mano.

C11 Which cold room panel thickness should be selected for each operating temperature regime?

General engineering guideline: 60–80 mm for +8/+15°C cool storage, 80–100 mm for +2/+8°C chillers, 100 mm for 0/+4°C fresh storage, 120–150 mm for -18/-22°C freezers, 150–180 mm for -25/-30°C deep freeze, and 180–200 mm for -35/-40°C blast freezers.

C12 What is the main difference between PUR and PIR insulated cold room panels?

Both provide high thermal insulation at 40–42 kg/m³ density, while PIR (Polyisocyanurate) features an enhanced isocyanurate ring structure that delivers superior fire resistance, reduced smoke emission, and compliance with industrial property insurance standards.

C13 What is the difference between Cam-Lock modular panels and continuous-line slip-joint panels?

Cam-lock modular panels allow rapid assembly and future disassembly/relocation for walk-in cold rooms. Continuous-line labyrinth slip-joint panels are engineered for tall industrial cold storage buildings and long partition walls up to 13.5 meters.

C14 Why is floor insulation critical in cold rooms and freezer chambers?

Without proper floor insulation in sub-zero rooms, ground moisture freezes and expands (frost heave), cracking the concrete slab. Modular rooms use birch-plywood + stainless steel floor panels, while forklift-rated warehouses use multi-layer high-compressive XPS/PIR below a reinforced concrete slab with underfloor heating or ventilation.

C15 Why are hygienic cove skirtings and rounded internal/external corner profiles (A02) required?

Sharp 90-degree wall-to-floor and wall-to-wall angles trap bacteria and organic residues. HACCP, IFS, and BRCGS food safety audits require coved (rounded radius) PVC/aluminium hygienic profiles for effortless sanitation.

C16 Which cold rooms require a pressure relief valve (A03)?

Rapid air contraction after door closure or defrost cycles creates strong vacuum pressure inside sealed rooms. Heated pressure relief valves are mandatory in all sub-zero freezers and blast rooms to prevent panel implosion and vacuum-locked doors.

MESA DIRECTA DE INGENIERÍA Y OFERTAS

Seleccione su Vía de Presupuesto (4 Canales Técnicos)

Seleccione el flujo adecuado a su proyecto; sus medidas y criterios técnicos se enviarán directamente a nuestra Mesa de Ingeniería por WhatsApp. (+90 (505) 507 04 18)

MESA DE INGENIERÍA SERPAN COLD

Solicite Cotización Rápida para Puertas Frigoríficas, Paneles o Naves de Frío

Ya sea un pedido de puertas/paneles o una nave frigorífica llave en mano, envíenos sus medidas para recibir una oferta técnica desglosada en el mismo día.

Fabricación a Medida 60–200 mm PUR/PIR Estructura de Acero SerHangar Exportación a 32+ Países
Línea de Ingeniería WhatsApp