KS02 — 500 m² Cold Storage Building Concept Project & 16-Section Engineering Analysis
KS02 (25.0 m × 20.0 m × 5.5 m) cold storage building concept: structural steel, insulated panel schedule, door package, and 16-section engineering analysis.
Quick Engineering Summary Card
KS02Bolted Structural Steel Frame & External Cladding
Çelik Karkaslı Bağımsız Depo Binası veya Büyük Fabrika İçi Kurulum
Internal Cold Room Panels & Ceiling T-Suspension
100 mm ve 150 mm Sürekli Hat PIR/PUR Soğuk Oda Panelleri + T-Askı Sistemi (~1.420 m²)
Industrial Door Package & Refrigeration Units
3 Adet 1400×2200 mm Sürgülü Soğuk Oda Kapısı (D02) + 2 Adet Yalıtımlı Rampa Kapısı (D07) + 2 Adet Servis Kapısı — 3 Adet Yarı Hermetik Split Grup veya Kompakt Merkezi Sistem + Uzaktan İzleme (R04)
2. Executive Overview & Target Investor Profile
KS02 (500 m²) — Bölgesel Gıda Dağıtıcıları, Meyve-Sebze Paketleme, Süt/Peynir Tesisleri ve İhracat Depoları
3. Architectural Dimensions & Zoning Principle
25.0 m × 20.0 m × 5.5 m — 2 Adet 0/+4°C Soğuk Muhafaza (220 m²) + 1 Adet -20°C Donmuş Muhafaza (130 m²) + +8/+12°C Ön Koridor / Sas (100 m²) + İdari/Teknik (50 m²)
4. Detailed Space Program Breakdown
| Functional Zone | Approx. Area (m²) | Target Temperature Regime | Engineering Role |
|---|---|---|---|
| Chilled & Frozen Storage Chambers | 340 m² | +2/+4°C & -18/-22°C | Primary palletized/crated cold storage volume |
| Conditioned Ante-Room & Staging Corridor (Sas) | 80 m² | +8°C / +12°C | Thermal airlock preventing warm ambient air ingress during order picking |
| Loading Dock & Buffer Zone | 50 m² | +10°C / +15°C | Truck docking interface with sectional doors and dock shelters |
| Plant Room & Dispatch Office | 30 m² | +18°C / +22°C | Refrigeration racks/units, electrical panels, and logistics office |
5. Structural Steel Engineering (SerHangar)
Çelik Karkaslı Bağımsız Depo Binası veya Büyük Fabrika İçi Kurulum (~22 tonnes SerHangar bolted structural steel).
6. External Roof & Facade Cladding System (SerPan Metal)
3-Rib / 5-Rib PUR/PIR Roof Sandwich Panels (P13) + Secret-Fix / Standard Facade Sandwich Panels (P14).
7. Internal Cold Envelope, Ceiling T-Suspension & Floor Insulation
100 mm ve 150 mm Sürekli Hat PIR/PUR Soğuk Oda Panelleri + T-Askı Sistemi (~1.420 m²) + T-Bar Ceiling Suspension (A05) + High-Compressive Floor Insulation (P12).
8. Door Schedule & Traffic Flow
3 Adet 1400×2200 mm Sürgülü Soğuk Oda Kapısı (D02) + 2 Adet Yalıtımlı Rampa Kapısı (D07) + 2 Adet Servis Kapısı + Steel Protection Bollards (A07).
9. Hygienic Cove Skirtings & Food Safety (HACCP)
HACCP / BRCGS / IFS R45 Antibacterial PVC Rounded Cove Skirtings & Corner Profiles (A02 / SPC-SO-HP).
10. Industrial Refrigeration, Evaporators & Automation
3 Adet Yarı Hermetik Split Grup veya Kompakt Merkezi Sistem + Uzaktan İzleme (R04)
11. Energy Efficiency, Vapor Barrier & Thermal-Break Detailing
Continuous thermal-break corner cuts, PU foam joint injection, and Heated Pressure Relief Valves (A03).
12. Investment & 5-Tier Supply Options
Available as Pre-Engineered Building Kit (B02), Installed Thermal Shell, or Full Turnkey Facility (B04).
13. Work Package & Responsibility Matrix (EK H05)
Scope boundaries are defined transparently in DOC16 (EK H05 Scope Responsibility Matrix).
DOC16 — EK H05 Matrisi14. Dispatch, Export Kit & Site Erection Workflow
Numbered shop drawings and export container/mega-truck loading optimization from Gebze / Kocaeli.
Sample Cold Storage Facility Layout (Ante-Room Corridor + Multi-Chamber + Docks)
For energy efficiency and cold-chain integrity, all chilled and frozen chambers open into a conditioned (+8/+12°C) staging corridor rather than directly outdoors.
Frequently Asked Engineering & Supply Questions
Frequently asked technical questions regarding cold room doors, panel thickness selection, thermal sealing details, and turnkey project workflows.
C31 What is the difference between building cold rooms inside an existing factory ("Box-in-Box") vs constructing a standalone cold storage building?
In a "Box-in-Box" project, the outer building already exists and insulated rooms are built inside. In a standalone "Cold Storage Building", SerPan Cold + SerHangar engineer the structural steel frame, external roof/facade cladding, internal insulated envelope, and loading docks as a single integrated facility.
C32 How are thermal bridges prevented in steel-framed cold storage buildings?
Primary steel columns and rafters are positioned outside the insulated thermal envelope wherever possible, with ceiling panels suspended via thermal-break hangers. Any internal columns are fully boxed with insulated panels and PU-injected joints.
C33 What is included in a Cold Storage Building Kit (B02)?
A pre-engineered package comprising structural steel members, external roof/facade cladding, internal cold room wall/ceiling panels, all insulated and traffic doors, flashing/corner profiles, suspension hardware, and assembly drawings—ideal for export and remote sites.
C34 Who handles civil works and concrete floor slabs in turnkey cold storage projects?
Foundations and civil concrete works are typically executed by the client's local civil contractor according to SerPan Cold load and elevation drawings, while floor vapor barriers, insulation, structural steel, panels, doors, and refrigeration are clearly defined in our Scope Matrix (EK H05).
C35 Why is the loading dock and sectional door interface critical for cold storage performance?
The truck dock interface is the most vulnerable link in the cold chain. Integrating insulated dock doors, inflatable/curtain dock shelters, and a conditioned staging corridor prevents ambient air infiltration during loading.