THERMAL & LAYOUT DESIGN SERPAN COLD ENGINEERING SYSTEMS

Site Survey, Thermal Load Engineering & CAD Layout Design

Proper upfront engineering minimizes panel cutting waste during construction and reduces forklift travel time and electricity bills over a 20-year facility lifecycle.

+15°C → -40°C Chiller, Freezer & Blast Regimes
60 – 200 mm 40–42 kg/m³ PUR & PIR Core
EN 10346 & HACCP 9-Layer Hygienic Steel & Profiles
81 İl & 32+ Ülke Direct Dispatch from Gebze Hub
Site Survey, Thermal Load Engineering & CAD Layout Design — SerPan Cold
THERMAL & LAYOUT DESIGN: Site Survey, Thermal Load Engineering & CAD Layout Design

Quick Engineering Summary Card

THERMAL & LAYOUT DESIGN
Mimari Çıktılar
Yerleşim, Kapı Yönü & T-Askı Planı Palet Raf Düzeni, Forklift Koridoru ve Zemin Yalıtım Kesitleri
Termal Yük Hesabı
İletim + Ürün + İnfiltrasyon Analizi Gerçek İklim ve Günlük Ürün Tonajına Göre Doğru Kapasite Seçimi
Metraj & Şartname
Kalem Bazlı Net BOQ Metraj Listesi Panel Boyları, Köşe Bükümleri, Kapı Pozları ve Aksesuar Listesi
Revizyon Öncesi
Üretim Öncesi 2B / 3B Onay Paftası Şantiyede Sürpriz Maliyetleri Önleyen Mühendislik Doğrulaması

Integrated Cold Chain Building, Panel & Door Systems

42 kg/m³ PUR / B-s1,d0 PIR sandwich panels, heavy-duty industrial cold storage doors, and central refrigeration packages manufactured at our Gebze plant.

ENGINEERING KNOWLEDGE BASE (EK C)

Frequently Asked Engineering & Supply Questions

Frequently asked technical questions regarding cold room doors, panel thickness selection, thermal sealing details, and turnkey project workflows.

C31 What is the difference between building cold rooms inside an existing factory ("Box-in-Box") vs constructing a standalone cold storage building?

In a "Box-in-Box" project, the outer building already exists and insulated rooms are built inside. In a standalone "Cold Storage Building", SerPan Cold + SerHangar engineer the structural steel frame, external roof/facade cladding, internal insulated envelope, and loading docks as a single integrated facility.

C32 How are thermal bridges prevented in steel-framed cold storage buildings?

Primary steel columns and rafters are positioned outside the insulated thermal envelope wherever possible, with ceiling panels suspended via thermal-break hangers. Any internal columns are fully boxed with insulated panels and PU-injected joints.

C33 What is included in a Cold Storage Building Kit (B02)?

A pre-engineered package comprising structural steel members, external roof/facade cladding, internal cold room wall/ceiling panels, all insulated and traffic doors, flashing/corner profiles, suspension hardware, and assembly drawings—ideal for export and remote sites.

C34 Who handles civil works and concrete floor slabs in turnkey cold storage projects?

Foundations and civil concrete works are typically executed by the client's local civil contractor according to SerPan Cold load and elevation drawings, while floor vapor barriers, insulation, structural steel, panels, doors, and refrigeration are clearly defined in our Scope Matrix (EK H05).

C35 Why is the loading dock and sectional door interface critical for cold storage performance?

The truck dock interface is the most vulnerable link in the cold chain. Integrating insulated dock doors, inflatable/curtain dock shelters, and a conditioned staging corridor prevents ambient air infiltration during loading.

DIRECT ENGINEERING & QUOTATION DESK

Select Your Enquiry Pathway (4 Specialized Engineering Tracks)

Select the pathway matching your requirement; your dimensions and technical parameters will be formatted and sent directly to our WhatsApp Engineering Desk. (+90 (505) 507 04 18)

SERPAN COLD ENGINEERING DESK

Get a Fast Engineering Quote for Cold Room Doors, Panels, or Cold Storage Buildings

Whether you need a single cold room door, panel schedule, or a complete steel-framed cold storage facility—share your dimensions for a same-day itemized technical quotation.

Custom-Sized Production 60–200 mm PUR/PIR SerHangar Steel Integration Export to 32+ Countries
WhatsApp Engineering Desk