THERMAL & LAYOUT DESIGN أنظمة SERPAN COLD الهندسية

Site Survey, Thermal Load Engineering & CAD Layout Design

Proper upfront engineering minimizes panel cutting waste during construction and reduces forklift travel time and electricity bills over a 20-year facility lifecycle.

+15°C → -40°C Chiller, Freezer & Blast Regimes
60 – 200 mm 40–42 kg/m³ PUR & PIR Core
EN 10346 & HACCP 9-Layer Hygienic Steel & Profiles
81 İl & 32+ Ülke Direct Dispatch from Gebze Hub
Site Survey, Thermal Load Engineering & CAD Layout Design — SerPan Cold
THERMAL & LAYOUT DESIGN: Site Survey, Thermal Load Engineering & CAD Layout Design

بطاقة الملخص الهندسي السريع

THERMAL & LAYOUT DESIGN
Mimari Çıktılar
Yerleşim, Kapı Yönü & T-Askı Planı Palet Raf Düzeni, Forklift Koridoru ve Zemin Yalıtım Kesitleri
Termal Yük Hesabı
İletim + Ürün + İnfiltrasyon Analizi Gerçek İklim ve Günlük Ürün Tonajına Göre Doğru Kapasite Seçimi
Metraj & Şartname
Kalem Bazlı Net BOQ Metraj Listesi Panel Boyları, Köşe Bükümleri, Kapı Pozları ve Aksesuar Listesi
Revizyon Öncesi
Üretim Öncesi 2B / 3B Onay Paftası Şantiyede Sürpriz Maliyetleri Önleyen Mühendislik Doğrulaması

Integrated Cold Chain Building, Panel & Door Systems

42 kg/m³ PUR / B-s1,d0 PIR sandwich panels, heavy-duty industrial cold storage doors, and central refrigeration packages manufactured at our Gebze plant.

قاعدة المعرفة الهندسية (EK C)

الأسئلة الهندسية والتوريدية الشائعة

الأسئلة الفنية الأكثر شيوعاً حول أبواب الغرف الباردة، اختيار سماكة الألواح، تفاصيل الإحكام الحراري ومشاريع تسليم المفتاح.

C31 What is the difference between building cold rooms inside an existing factory ("Box-in-Box") vs constructing a standalone cold storage building?

In a "Box-in-Box" project, the outer building already exists and insulated rooms are built inside. In a standalone "Cold Storage Building", SerPan Cold + SerHangar engineer the structural steel frame, external roof/facade cladding, internal insulated envelope, and loading docks as a single integrated facility.

C32 How are thermal bridges prevented in steel-framed cold storage buildings?

Primary steel columns and rafters are positioned outside the insulated thermal envelope wherever possible, with ceiling panels suspended via thermal-break hangers. Any internal columns are fully boxed with insulated panels and PU-injected joints.

C33 What is included in a Cold Storage Building Kit (B02)?

A pre-engineered package comprising structural steel members, external roof/facade cladding, internal cold room wall/ceiling panels, all insulated and traffic doors, flashing/corner profiles, suspension hardware, and assembly drawings—ideal for export and remote sites.

C34 Who handles civil works and concrete floor slabs in turnkey cold storage projects?

Foundations and civil concrete works are typically executed by the client's local civil contractor according to SerPan Cold load and elevation drawings, while floor vapor barriers, insulation, structural steel, panels, doors, and refrigeration are clearly defined in our Scope Matrix (EK H05).

C35 Why is the loading dock and sectional door interface critical for cold storage performance?

The truck dock interface is the most vulnerable link in the cold chain. Integrating insulated dock doors, inflatable/curtain dock shelters, and a conditioned staging corridor prevents ambient air infiltration during loading.

مكتب الهندسة وعروض الأسعار المباشر

اختر مسار طلب عرض السعر (4 مسارات هندسية متخصصة)

اختر المسار المناسب لطلبك؛ سيتم تنسيق المقاسات والمعايير الفنية وإرسالها مباشرة إلى مكتبنا الهندسي عبر واتساب. (+90 (505) 507 04 18)

المكتب الهندسي لشركة SERPAN COLD

احصل على عرض سعر سريع لأبواب الغرف الباردة أو الألواح العازلة أو مباني التبريد

سواء كنت بحاجة إلى باب أو ألواح مفردة أو مستودع تبريد متكامل بهيكل فولاذي — أرسل مقاساتك ليقوم فريقنا الهندسي بإعداد عرض فني مفصل في نفس اليوم.

تصنيع بمقاسات خاصة ألواح 60–200 مم PUR/PIR تكامل الهياكل الفولاذية SerHangar تصدير إلى أكثر من 32 دولة
خط الهندسة عبر واتساب