Tekirdağ Cold Storage Warehouse, Cold Room Door & Panel Solutions
Cold room doors, 80–180 mm PUR/PIR insulated panels, and turnkey steel-framed cold storage buildings engineered for Tekirdağ (+36°C summer design temperature).
Quick Engineering Summary Card
TR-59Climate & Industry-Tailored Cold Storage Engineering for Tekirdağ
Engineered for Tekirdağ's summer design ambient temperature of +36°C, we specify 80–180 mm high-density PUR/PIR panels and thermal-break doors to prevent condensation and minimize compressor power consumption.
From our Gebze (Kocaeli) manufacturing hub, we supply standalone hinged/sliding cold room doors, panel packages, and complete SerHangar steel-framed turnkey cold storage buildings across Tekirdağ and all organized industrial zones.
80–180 mm PUR/PIR Panels for Tekirdağ
42 kg/m³ PUR and B-s1,d0 PIR cam-lock panels engineered for +36°C summer design temperatures.
Thermal-Break Hinged, Sliding & Monorail Doors
Dual-gasket, heated-frame heavy-duty cold storage doors for Tekirdağ industrial facilities.
Turnkey Steel-Framed Cold Storage in Tekirdağ
Trakya et/şarküteri fabrikaları, süt/peynir, liman ve OSB lojistik soğuk depoları
Explore Other Province Cold Storage Engineering Pages (All 81 Provinces)
Two Structural Approaches: External Steel Frame vs. Box-in-Box Cold Rooms
With SerPan Cold + SerHangar integration, we engineer both standalone steel-framed cold storage buildings and T-bar suspended envelopes inside existing halls.
Frequently Asked Engineering & Supply Questions
Frequently asked technical questions regarding cold room doors, panel thickness selection, thermal sealing details, and turnkey project workflows.
IL-S1 How does ambient summer temperature affect cold room panel thickness in Tekirdağ?
Because summer design temperatures reach +36°C in Tekirdağ, specifying 80–180 mm PUR/PIR panels and tropicalized condensers prevents condensation and reduces energy consumption.
C31 What is the difference between building cold rooms inside an existing factory ("Box-in-Box") vs constructing a standalone cold storage building?
In a "Box-in-Box" project, the outer building already exists and insulated rooms are built inside. In a standalone "Cold Storage Building", SerPan Cold + SerHangar engineer the structural steel frame, external roof/facade cladding, internal insulated envelope, and loading docks as a single integrated facility.
C32 How are thermal bridges prevented in steel-framed cold storage buildings?
Primary steel columns and rafters are positioned outside the insulated thermal envelope wherever possible, with ceiling panels suspended via thermal-break hangers. Any internal columns are fully boxed with insulated panels and PU-injected joints.
C33 What is included in a Cold Storage Building Kit (B02)?
A pre-engineered package comprising structural steel members, external roof/facade cladding, internal cold room wall/ceiling panels, all insulated and traffic doors, flashing/corner profiles, suspension hardware, and assembly drawings—ideal for export and remote sites.
C34 Who handles civil works and concrete floor slabs in turnkey cold storage projects?
Foundations and civil concrete works are typically executed by the client's local civil contractor according to SerPan Cold load and elevation drawings, while floor vapor barriers, insulation, structural steel, panels, doors, and refrigeration are clearly defined in our Scope Matrix (EK H05).
C35 Why is the loading dock and sectional door interface critical for cold storage performance?
The truck dock interface is the most vulnerable link in the cold chain. Integrating insulated dock doors, inflatable/curtain dock shelters, and a conditioned staging corridor prevents ambient air infiltration during loading.
Select Your Enquiry Pathway (4 Specialized Engineering Tracks)
Select the pathway matching your requirement; your dimensions and technical parameters will be formatted and sent directly to our WhatsApp Engineering Desk. (+90 (505) 507 04 18)